Sunday, May 9, 2010

 
Posted by Picasa

and the board gave barhite and holzinger a raise to manage the building

These holes are getting bigger and bigger, the one outside by the garage door is 3 feet now and getting deeper. This pothole has been here for over a year and was there when they blacktopped the area to about 2 feet to the right of it. The board made a decision to not fix it and blacktop the rear of the driveway.
The hole in the garage was reported to barhite and holzinger management about 6 months ago.
 
Posted by Picasa
 
Posted by Picasa
 
Posted by Picasa